Key facts
- Location
- Redmain, Cumbria, North West
- Our role
- Construction Management and Quality Assurance
- Status
- Complete
- Dates
- 2017 to 2021
Overview
Williamsgate Water Treatment Works is a new potable water treatment works near Redmain in Cumbria, built as part of the West Cumbria water supply investment. Public descriptions refer to raw water drawn from Thirlmere, treatment capacity of around 80 million litres per day, treated water storage, pumping, hydro generation and extensive reinforced concrete process facilities.
Construction Management and Quality Assurance Scope
Setting out and construction control
Setting out and control of reinforced concrete structures and associated works.
Quality assurance
Reinforcement and concrete quality assurance, inspections and inspection and test plans.
Engineering records
Accurate engineering documentation and records to support handover of the completed assets.
Approach
Water retaining structures leave no room for shortcuts. Each pour was checked against its inspection and test plan, records were kept as the work progressed and quality was treated as part of the programme rather than a separate activity.
Outcome
Williamsgate forms part of the regional investment that secures the long term water supply for West Cumbria.
Matthews & Roberts provides project management and quality assurance on utilities projects across the North West. See our energy and utilities work. Read our insight on managing risk in data centre and utilities construction.
Working on a North West utilities scheme? See our construction project management service and our North West coverage.
Frequently asked questions
Why is concrete quality so important on water treatment works?
Process tanks and treated water storage must be watertight and durable for decades. Reinforcement checks, concrete inspections and test records give assurance that every structure meets its specification.
What does a water treatment works include?
A typical works includes inlet and treatment process structures, treated water storage, pumping stations and the pipework, controls and power that connect them.
Contract administration
Guides and templates for this kind of work
Notices, programme and change all affect each other. These cover the related steps.
Guides
- NEC4 Compensation Events: A Contractor's Guide to Notifying, Quoting and RecoveringNotifying and valuing compensation events under clause 60.
- NEC4 Early Warnings: A Contractor's Guide to Clause 15 and the Early Warning RegisterRaising early warnings under clause 15 and running the register.
- NEC4 Accepted Programme: What Clause 31 Requires and Why It Protects the ContractorGetting the programme accepted and keeping it current.