Health & Safety

Which Health and Safety Accreditations Do Construction Contractors Need? CHAS, SSIP, SafeContractor and Constructionline

Main contractors and clients rarely accept a subcontractor without health and safety accreditation. Here is how SSIP, CHAS, SafeContractor, Constructionline and ISO 45001 fit together.

Matthews & Roberts2 min read
Construction contractor office preparing health and safety accreditation evidence
On this page
  1. SSIP: the umbrella
  2. CHAS, SafeContractor and SMAS
  3. Constructionline
  4. ISO 45001
  5. Sector schemes
  6. Individual cards are separate
  7. How to pass first time
  8. Accreditation support in the North West

Most construction contractors need at least one SSIP recognised health and safety accreditation to win work with main contractors. CHAS, SafeContractor and SMAS Worksafe are common choices. Constructionline, ISO 45001 and sector schemes such as RISQS are added as the client base grows.

SSIP: the umbrella

SSIP (Safety Schemes in Procurement) brings together health and safety assessment schemes that recognise each other's core assessments. The aim is simple: a contractor that has passed one SSIP member scheme should not have to prove the same basics again for another.

Member schemes include CHAS, SafeContractor, SMAS Worksafe and Acclaim, among others.

CHAS, SafeContractor and SMAS

These are the schemes most often named in subcontract packages. Each assesses your health and safety policy, risk assessments, training, competence and arrangements for managing subcontractors. The questions differ slightly. The evidence they want is largely the same.

Constructionline

Constructionline is a prequalification register used by many buyers in the public and private sectors. Its higher membership levels include a health and safety question set aligned with PAS 91, the standard prequalification questionnaire for construction.

ISO 45001

ISO 45001 is the international standard for occupational health and safety management systems. It requires a documented system, objectives, internal audits and management review. It suits contractors who want to work on larger frameworks or who already hold ISO 9001 and ISO 14001.

Sector schemes

  • RISQS for suppliers to the rail industry
  • Client specific prequalification on utilities, highways and major infrastructure frameworks

See our guide to rail and civil engineering health and safety requirements.

Individual cards are separate

CSCS cards, SMSTS and SSSTS relate to individual people, not the company. Accreditation assessors will usually ask how you check them. Read IOSH or NEBOSH for more on individual qualifications.

How to pass first time

  1. 1Get your policy and arrangements current and signed by a director
  2. 2Make risk assessments specific to the work you actually do
  3. 3Keep training and competence records in one place
  4. 4Show how you control subcontractors with real examples
  5. 5Run a health and safety audit before the assessor does

Accreditation support in the North West

Matthews & Roberts provides PQQ and accreditation support and health and safety consultants for contractors in Liverpool, Manchester, Wigan, Bolton and across the North West.

Frequently asked questions

What is SSIP?

SSIP stands for Safety Schemes in Procurement. It is an umbrella forum whose member schemes recognise each other's core health and safety assessments, so a contractor should not need to prove the same basics to several schemes.

Is CHAS the same as SSIP?

CHAS is one of the SSIP member schemes. A CHAS assessment that meets the SSIP core criteria can be recognised by other member schemes.

Do I need ISO 45001?

ISO 45001 is not a legal requirement. It is an international standard for health and safety management systems. Larger clients and frameworks often ask for it, especially on public sector and infrastructure work.

Health and safety support

Related guides and templates

Choosing the right level of support starts with knowing what you need. These help.

Need support with health & safety on your project?

More insights

View all insights