Key facts
- Our role
- Quality Assurance and Construction Control
- Status
- Complete
- Dates
- 2014 to 2017
Overview
Davyhulme Wastewater Treatment Works in Trafford is one of the largest treatment works operated by United Utilities. Its modernisation included major reinforced concrete assets, large diameter final settlement tank pipework, rising, inlet and outlet mains and upgrades to treatment capacity.
Quality Assurance and Construction Control Scope
Setting out and construction control
Setting out and control of reinforced concrete and drainage works.
Quality assurance
Concrete inspections, quality assurance and inspection records.
Engineering records
Accurate engineering documentation to support handover of the new assets.
Approach
The works had to keep treating flows throughout. Activities were coordinated with the operator, connections to live assets were carefully sequenced and quality records were kept current as each structure was built.
Outcome
The modernisation increased the capacity and performance of a major treatment works serving Greater Manchester.
Matthews & Roberts provides project management and quality assurance on utilities projects in Manchester and across the North West. See our energy and utilities work. Read our insight on managing risk in data centre and utilities construction.
Need a project manager on a Greater Manchester site? See our construction project management in Manchester service.
Frequently asked questions
What does modernising a wastewater treatment works involve?
Modernisation typically increases treatment capacity and improves effluent quality. It involves new reinforced concrete process structures, large diameter pipework and mains, all delivered while the existing works keeps treating flows.
How is construction managed on an operational treatment works?
Through close coordination with the operator, controlled access and permits, careful sequencing of connections to live assets and strict quality records for every structure handed over.
Project set up and delivery
Guides and templates for this kind of work
Good projects are set up early. These cover the steps either side of this one.
Guides
- Construction Project Mobilisation: A First 10 Working Days ChecklistWhat an external project manager should review, set up and report back in the first 10 working days on a...
- Principal Contractor Checklist: The First Week on SiteThe first week on site sets the standard for the whole construction phase. This checklist covers what a Principal...
- What Is a Construction Baseline Programme? A Contractor's GuideSetting a baseline programme that stands up to scrutiny.