Free template · Commercial

Elemental Cost Plan Template

A free Excel cost plan for clients and developers, set out by NRM1 group element with cost per square metre and the cost limit calculated for you.

Free to download, no sign up. White labelled so you can add your own company name and logo.

Need help using it?0151 332 6581info@matthewsroberts.com

Preview of the Elemental cost plan template

About this template

What the Elemental cost plan template is for

A cost plan gives the client a budget for every element of the building before the design is fixed, so decisions are made with the cost in view.

This template follows the NRM1 group elements and builds up from the building works estimate to the cost limit, with the cost per square metre shown on every line.

What is included

  • Project details and gross internal floor area
  • Sixteen NRM1 group elements
  • Quantity, rate and total for each element
  • Cost per square metre calculated automatically
  • Preliminaries, overheads, fees, risk and inflation
  • Cost limit excluding VAT

How to use it

Using the Elemental cost plan template on your project

  1. 01

    Enter the floor area

    Add the gross internal floor area so rates per m2 calculate.

  2. 02

    Price each element

    Use the design information available at each stage.

  3. 03

    Add the allowances

    Include preliminaries, fees, risk and inflation.

  4. 04

    Update each stage

    Revise the plan as the design develops and record changes.

Avoid these

Common mistakes we see on site

  • No allowance for risk or inflation
  • Assumptions not recorded
  • Cost plan not updated as design changes
  • Fees and other development costs left out

Prefer us to handle it?

We can run this for you on site

Matthews & Roberts provides the people behind these templates: Temporary Works Coordinators, quantity surveyors, project managers and health and safety consultants across Liverpool, Manchester, the North West and North Wales.

Send us a message
Insights
View all insights

FAQ

Elemental Cost Plan Template: questions

What is an elemental cost plan?

A cost plan that breaks the project cost into building elements such as substructure, frame and services, so the budget can be controlled as the design develops.

What is NRM1?

The RICS New Rules of Measurement for order of cost estimating and cost planning.

Does the template calculate totals?

Yes. Element totals, cost per m2 and the cost limit calculate automatically.

Can you prepare a cost plan for us?

Yes. Our quantity surveyors prepare estimates and cost plans for clients and developers.

Talk to us

Need support on your project?

Tell us about your site and what you need. We will come back within one working day with a clear proposal and a named consultant.

Call 0151 332 6581

Email info@matthewsroberts.com

3a Bridgwater Street, Baltic Triangle, Liverpool L1 0AR

Send us a message

Or call 0151 332 6581 or email info@matthewsroberts.com

We use your details only to reply to your enquiry.