Key facts
- Location
- Wacol, Brisbane, Australia
- Our role
- Contract Management
- Status
- Complete
- Dates
- 2023 to 2024
- Value
- A$1m to A$5m
On this page
Overview
The Wacol Water Infrastructure Project renewed the water network serving the Wacol Government Precinct in Brisbane, which includes correctional facilities, West Moreton Health and Queensland Police sites. The works replaced ageing and non compliant water mains, introduced redundancy into the network, decommissioned legacy assets and transferred the upgraded network to Urban Utilities.
The project was delivered in two stages between late 2023 and late 2024.
Contract Management Scope
Zero downtime supply
Coordination of the live water main upgrade so that supply to the precinct was maintained throughout. Critical shutdowns were planned and sequenced with the operator, supported by temporary bypasses.
Contractor works and sequencing
Management of contractor works, sequencing and site interfaces across an operational government precinct.
Testing, quality and handover
Testing and quality assurance of new mains before connection, followed by handover of the completed network.
Commercial management
Review of subcontractor claims against contract terms, preparation and submission of client claims and substantiation of variations.
Approach
On a network that serves critical facilities, every shutdown carries risk. Each one was planned in detail, communicated well in advance and backed by temporary supply arrangements so that the facilities on the precinct were never left without water.
Outcome
The renewed network was completed and transferred to Urban Utilities, giving the precinct a more resilient water supply with redundancy built in.
Matthews & Roberts provides project management and commercial management on utilities and critical infrastructure projects. See our energy and utilities work. Read our insight on managing risk in data centre and utilities construction.
Frequently asked questions
How is a live water main replaced without interrupting supply?
Through careful staging. Temporary bypasses keep water flowing while each section is replaced, critical shutdowns are planned in short windows with the operator and every connection is tested before the network is returned to service.
Why does commercial control matter on utilities projects?
Live networks bring unforeseen conditions. Robust review of subcontractor claims, timely variation submissions and accurate forecasting keep the project within its budget while the scope adapts to what is found underground.
Commercial control
Guides and templates for this kind of work
A commercial review draws on more than one record. These guides and templates support it.
Guides
- Cost Value Reconciliation in Construction: A Contractor's Guide to CVRHow to compare cost with value and report the margin honestly.
- What Is a Bill of Quantities and What Is NRM2?How the bill is measured under NRM2 and used to price and value work.
- How Are Construction Variations Valued? A Guide for ContractorsValuing change under the contract so it lands in the CVR.