

Homes for
a brighter tomorrow.
Hattelle Homes creates thoughtful residential developments designed around people, place and long-term value — looking beyond the building itself to consider how homes perform, how neighbourhoods connect and how each development can leave a positive legacy.
Developed in partnership with Matthews & Roberts.
People. Places. A Brighter Tomorrow.
Matthews & Roberts DevelopmentDesigned around life.
A good home has to do more than look right.
It should be comfortable, efficient, practical and built to endure. The spaces around it should feel considered — streets should connect, landscaping should mature and a development should make sense both on the day it is completed and years afterwards.
That is the thinking behind Hattelle Homes.

Building with
tomorrow in mind.
Sustainability starts long before construction. It begins with how a site is planned, how a home is orientated, how much energy it needs and how the landscape around it is treated.
We apply considered thinking at every stage. We do not make promises we cannot substantiate.
We aim to reduce energy demand through considered orientation, insulation, airtightness and efficient building systems, with opportunities for renewable technologies incorporated where appropriate to the development.
We favour durable, considered material choices that support long service life, maintainability and lower whole-life impact — homes built to perform well beyond the day they are completed.
Green space should be part of the development from the outset. Landscape, planting, drainage and opportunities for habitat enhancement are considered at the earliest stages of each scheme.
A successful development is more than a collection of homes. Connections, movement, amenity, character and the relationship between private and shared space all shape how a place feels to live in.
We aim to reduce energy demand through considered orientation, insulation, airtightness and efficient building systems, with opportunities for renewable technologies incorporated where appropriate to the development.
We favour durable, considered material choices that support long service life, maintainability and lower whole-life impact — homes built to perform well beyond the day they are completed.
Green space should be part of the development from the outset. Landscape, planting, drainage and opportunities for habitat enhancement are considered at the earliest stages of each scheme.
A successful development is more than a collection of homes. Connections, movement, amenity, character and the relationship between private and shared space all shape how a place feels to live in.
Considered from the inside out.
Natural Light
We aim to make the best possible use of daylight and orientation — practical layouts that feel bright and connected to the outside.
Comfort
Homes should feel comfortable throughout the year. Thermal performance, ventilation and efficient systems are considered from the design stage.
Space That Works
Layouts respond to the realities of modern life — storage, flexible working, family routines and everyday practicality.
Quality That Lasts
Materials and detailing are selected with durability in mind. A well-specified home holds its value and requires less disruption to maintain.
Connection to Outdoors
Private gardens, balconies and shared green space are considered as part of the home from the outset — not added because planning required them.
Homes in Context
Every development should make sense in its setting — streetscape, scale, material palette and how each scheme sits within its neighbourhood.

Homes for
a brighter tomorrow.
Hattelle Homes
Homes, neighbourhoods and new uses for existing places.
Hattelle Homes focuses on residential and residential-led development — from new housing and apartment schemes to regeneration and the thoughtful conversion of existing buildings.
Some of the strongest residential opportunities already exist. Underused buildings, redundant commercial property and brownfield land can often be transformed rather than simply replaced. We look for opportunities where thoughtful planning, design and investment can give an existing place a useful new future.
New Homes
New housing across a range of scales, tenures and settings.
Apartment Living
Mid rise and low rise residential for sale and rent.
Regeneration
Brownfield and urban sites with a meaningful residential component.
Building Conversion
Thoughtful conversion of existing buildings into residential use.
Residential-Led Mixed Use
Schemes where residential is the principal element.
Affordable and Partnered
Schemes with housing associations and local authorities.
A home belongs to a place.
We consider the spaces between the buildings as carefully as the buildings themselves — streets, planting, boundaries, movement, views and connections.
The objective is straightforward: homes people are proud to live in, within places that improve with time.
Have a site with potential?
We are interested in land, existing buildings and regeneration opportunities capable of supporting thoughtful residential development. From an initial conversation, Matthews & Roberts and Hattelle Homes can assess planning potential, development viability and the practical route from opportunity to delivery.
We welcome introductions from landowners, property owners, agents, investors and development partners.
Our developments
Selected residential development opportunities being progressed by Hattelle Homes in partnership with Matthews & Roberts.
Our developments will be published here as opportunities progress.
Residential vision. Built-environment capability.
Hattelle Homes provides the residential development identity and direction.
Matthews & Roberts brings connected Management, Engineering and Development capability — moving opportunities from feasibility and planning through design, procurement and delivery.

Residential vision and development
Matthews and Roberts Development
Opportunity · Feasibility · Planning · Delivery
Matthews and Roberts Engineering
Survey · Design · Technical
Matthews and Roberts Management
Programme · Commercial · Assurance
Completed homes and places
Matthews and Roberts capability
Management
Project management, commercial management, CDM, health and safety and quality assurance.
Learn moreEngineering
Structural engineering, temporary works design and BIM coordination.
Learn moreDevelopment
Land assessment, planning support, procurement, employer's agent and full lifecycle management.
Learn more