Manufacturing construction, without stopping the line

Independent construction consultancy for industrial facilities, with particular specialism in paper and cardboard manufacturing — mills, corrugated and packaging plants, tissue lines, and recycling. Continuous production, heavy plant, and real fire and dust risk, managed with discipline.

Paper & cardboard specialists Live-production interface DSEAR & combustible-dust literate

The manufacturing brief

On a paper line, downtime is the real cost

A paper mill or cardboard plant runs continuously, and every hour the line is down is measured in lost tonnes, not just lost programme. Building or upgrading these facilities means working around live process plant, high-volume water and steam, and a genuine combustible-dust and fire risk — where a poorly-planned tie-in or a careless hot-works permit is a serious event, not a snag.

We act for manufacturers, operators, and developers as an independent client-side consultancy, with a particular specialism in paper and cardboard production. We sequence construction and tie-ins around production windows, hold rigorous DSEAR and hot-works discipline, and manage commissioning so new plant proves out under load — protecting output while the facility is transformed around it.

Where we add value

Paper & cardboard depth
Real understanding of mills, converting, tissue, and pulping plant.
Production protected
Tie-ins and phasing planned around continuous 24/7 output.
Fire & dust discipline
Combustible-dust and DSEAR risk managed, not assumed away.
Proven under load
Commissioning that proves water, steam, and process systems in service.

Capabilities

Specialists in paper & cardboard, fluent across industry

Paper & cardboard manufacturing

Our specialism

Paper mills, corrugated and cardboard plants, tissue and packaging lines, and recycling and pulping facilities. Heavy process plant, high-volume water and steam systems, combustible-dust and fire risk, and unforgiving continuous-production programmes — the environment we know best, delivered around a line that never stops.

Recycling & pulping facilities

Materials recovery, repulping, and fibre-processing plants — conveyor and baler installation, effluent treatment, and construction sequenced around live recycling throughput.

Warehousing & logistics

Distribution centres and automated warehousing built alongside live operations moving tens of thousands of parcels a day, with zero tolerance for disruption.

Controlled & process environments

Cleanrooms, food and beverage lines, and pharmaceutical production requiring ISO 14644 classification and GMP-grade commissioning and validation.

Track record

Output protected, plant proven

Continuousproduction kept

Paper and packaging plants run 24/7 — we sequence construction and tie-ins around live production so the line keeps running and output is protected.

Zerodisruption

A warehouse expansion built next to a live distribution operation handling 50,000 parcels a day, delivered across 12 months with zero operational disruption.

ISO Class 7first-time pass

A cleanroom facility taken from design to validation, achieving ISO 14644 classification on the first attempt.

In our clients’ words

Our warehouse expansion was constructed adjacent to our live distribution operation handling 50,000 parcels per day. They managed the construction interface, ensuring zero disruption to our operation throughout the 12-month build programme.
Operations DirectorLogistics Company, Midlands
They managed the construction of our cleanroom facility from design through to validation. Their understanding of both CDM requirements and GMP commissioning protocols meant we achieved ISO 14644 classification on the first attempt.
Facilities DirectorManufacturer, Cheshire

Manufacturing questions

What clients ask us about manufacturing projects

Yes — it is a core specialism. We provide project management, CDM advisory, and commissioning governance for paper mills, corrugated and cardboard plants, tissue and packaging lines, and recycling and pulping facilities. These environments combine heavy process plant, high-volume water and steam systems, significant combustible dust and fire risk, and continuous 24/7 production that cannot simply be switched off for construction. We plan tie-ins, shutdowns, and phased works around production so output is protected while the facility is built or upgraded.

This is a core competence. Manufacturing construction frequently requires work alongside or within operational production. We develop construction interface management plans addressing isolation procedures, contamination and dust prevention, service continuity, production-schedule coordination, and emergency response — minimising disruption while maintaining construction progress. On continuous-process sites like paper mills, we plan tie-ins into planned shutdown windows.

Paper, cardboard, and tissue facilities carry significant combustible dust and fire loading — stored fibre, dust accumulation, and hot process equipment. Construction in these environments demands rigorous hot-works permit systems, dust management, maintained fire detection and suppression with formal impairment procedures, and careful DSEAR consideration where dust atmospheres can form. Our Principal Designers address these hazards directly in pre-construction information.

Manufacturing environments create specific CDM risks beyond standard construction — DSEAR/ATEX zones, combustible dust, confined spaces, heavy overhead crane operations, process chemical exposure, and live machinery interfaces. Our Principal Designers address these sector-specific hazards in pre-construction information and ensure contractors develop method statements appropriate to the manufacturing environment.

Yes. We provide commissioning management from pre-commissioning through hot commissioning and Site Acceptance Testing — developing commissioning plans, coordinating specialist commissioning contractors, managing documentation, and ensuring systems achieve performance specifications before operational handover. For paper and process plants this includes proving water, steam, and effluent systems under load.

We manage cleanroom construction requiring ISO 14644 classification from ISO Class 5 to ISO Class 8, across pharmaceutical, semiconductor, and food manufacturing environments. Our project management integrates construction delivery with the rigorous commissioning and validation protocols that controlled environments demand.

Yes. Manufacturing projects typically involve significant process equipment — production lines, converting and packaging equipment, storage and conveyor systems, and specialist plant. We coordinate between building contractors and equipment suppliers, manage installation sequences, and ensure building services are ready for equipment commissioning.

Manufacturing construction involves specialist temporary works including heavy crane lifts for equipment installation, structural propping during building modifications, temporary environmental controls for cleanroom construction, and temporary services to maintain production during construction phases.

Yes. We ensure CDM pre-construction information identifies DSEAR zones and ATEX requirements, that designers account for explosive atmosphere risks — including combustible dust in paper and cardboard plants — and that contractors develop appropriate method statements for working within or adjacent to classified zones, including hot-works management within DSEAR-classified areas.

Start a conversation

Planning a manufacturing project?

Whether it is a new paper or cardboard line, a mill upgrade, a warehouse expansion, or a controlled-environment facility, we will tell you plainly what it takes to deliver it without stopping production. Speak to our manufacturing team.

Paper and cardboard manufacturing specialism
Construction sequenced around continuous production
DSEAR, combustible-dust, and hot-works governance
Commissioning that proves plant under load

Get in Touch

We will aim to respond within 24hrs.

Client Portal

The Client Portal provides secure access to project documents, progress updates, and direct communication with your Matthews & Roberts team.

Request access: info@matthewsroberts.com

Portal access is provided to approved clients. Contact us if you need support.

Existing client?

Access your project portal to view documents and track progress.

New enquiry?

Tell us about your project and we'll respond within 24 hours.