Commercial office construction and fit-out project management in the UK

Commercial Offices & Workplaces

Commercial workplaces, delivered to perform

Independent construction consultancy for office towers, Cat A and Cat B fit-out, and occupied refurbishment. We protect programme, cost, and tenant relationships from first appraisal to handover.

Client-side & independent BCO & BREEAM literate Occupied-building specialists

The commercial brief

Every commercial decision is a letting decision

A commercial building only earns when it is let, and it is only let when it performs — against the BCO specification, against energy standards, and against what an occupier can picture themselves working in. Construction is the means; lettability is the point.

We act for landlords, developers, investors, and occupiers as an independent client-side consultancy. That independence means our advice serves your asset and your programme — not a contractor’s margin. From feasibility and cost planning through occupied construction to handover, we hold the line on quality, cost certainty, and the tenant relationships that protect future income.

Where we add value

Independent of the supply chain
Advice measured against your asset, never a contractor's commercial position.
Fluent in occupied delivery
Construction managed around live tenancies without eroding relationships.
Cost certainty, early
Realistic budgets and value engineering before commitments are made.
Compliance as standard
CDM 2015, Building Regulations, BREEAM, and MEES held throughout.

Capabilities

Built for the realities of the commercial market

Office towers & headquarters

Shell-and-core delivery and major refurbishment of multi-storey office stock, including facade, vertical transportation, and base-building M&E serving multiple tenants.

Cat A & Cat B fit-out

Landlord Cat A works that make a floor lettable, and tenant Cat B workspace delivery — partitioning, technology, and brand, benchmarked to the BCO Guide to Specification.

Occupied refurbishment

Construction alongside live tenancies — acoustic and dust control, maintained fire strategy, out-of-hours services, and proactive tenant liaison that protects relationships.

Multi-building programmes

Phased delivery across estates and business parks, sequenced around lease events and EPC improvement so no more of the portfolio is in construction than the business can absorb.

Track record

Outcomes that protect income

45,000sq ft

Cat B fit-out delivered across three occupied floors of a Grade A Manchester tower — with zero formal complaints from adjacent tenants.

6buildings

Business-park refurbishment programme improved from EPC G to EPC B across every building, phased around live tenant leases.

2027MEES horizon

EPC improvement programmes structured now for the rising minimum standard, protecting lettability before the deadline bites.

In our clients’ words

Construction took place while the floors above and below remained fully occupied. Their out-of-hours coordination and tenant liaison delivered the project without a single formal complaint.
Head of WorkplaceProfessional Services Firm, Manchester
They phased the works around existing leases and managed EPC improvements from G to B across every building, with no more than two buildings in construction at any time.
Asset ManagerInstitutional Investor, South East

Commercial questions

What clients ask us about commercial projects

Category A brings a shell-and-core floor to a marketable standard — raised floors, suspended ceilings, basic M&E distribution, fire protection, and neutral finishes. It creates a blank canvas, and is typically the landlord's responsibility. Category B is the tenant's own fit-out installed on top: partitioning, meeting rooms, reception, kitchen, technology, and brand identity.

We develop occupied building management plans covering restricted working hours, acoustic hoarding, dust containment with negative air pressure, maintained fire compartmentation and escape routes, phased building-services shutdowns out of hours only, and coordinated goods-lift access. Tenant communication is managed proactively throughout.

The British Council for Offices Guide to Specification is the industry benchmark for commercial office quality, defining standards for floor-to-ceiling heights, floor loading, power provision, cooling capacity, lighting levels, and common-area design. We reference it throughout design review and construction to ensure offices meet market expectations and lettability requirements.

The Minimum Energy Efficiency Standards currently require a minimum EPC rating of E for commercial lettings, with proposals to raise this to C by 2027 and B by 2030. Non-compliant buildings cannot be legally let. We manage EPC improvement programmes including fabric upgrades, M&E improvements, and renewable installations to achieve target ratings.

Yes — from both landlord and tenant perspectives, following the RICS Dilapidations Protocol: initial condition survey, schedule review, cost assessment, negotiation support, and reinstatement works management. Early assessment can reduce tenant exit costs significantly, while robust documentation protects landlord reinstatement claims.

Yes. We specialise in phased delivery across multiple floors or buildings — sequencing construction to minimise disruption, maintaining services to occupied areas, coordinating tenant decants, and delivering each phase to a self-contained completion while maintaining continuity across the wider programme.

Start a conversation

Planning a commercial project?

Whether it is a single-floor fit-out, an occupied tower refurbishment, or an estate-wide EPC programme, we will tell you plainly what it takes to deliver it well. Speak to our commercial team.

Independent, client-side representation
Cost certainty from feasibility onwards
Occupied-building delivery without complaints
BCO, BREEAM, and MEES compliance managed throughout

Get in Touch

We will aim to respond within 24hrs.

Client Portal

The Client Portal provides secure access to project documents, progress updates, and direct communication with your Matthews & Roberts team.

Request access: info@matthewsroberts.com

Portal access is provided to approved clients. Contact us if you need support.

Existing client?

Access your project portal to view documents and track progress.

New enquiry?

Tell us about your project and we'll respond within 24 hours.