Data Centres &
Utilities

Quality assurance and CDM compliance for mission-critical infrastructure where construction quality determines operational reliability.

In mission-critical construction, the margin for error during commissioning is zero. What you build is what you operate—there's no remediation once the facility goes live.

Programme pressure is constant. Capacity demand drives aggressive timelines, but cutting corners on quality creates reliability debt that compounds across the asset lifecycle. The question isn't whether you can go faster—it's whether your QA regime will hold under that speed.

What we control in critical infrastructure

We bring rigorous governance to accelerated programmes. Our role is to ensure quality verification keeps pace with construction—not catching defects at commissioning, but preventing them at source.

Quality assurance regimes aligned to Tier III/IV certification requirements

M&E interface coordination across civil, electrical, and mechanical packages

Design change governance with impact assessment for commissioning milestones

Commissioning readiness verification before live load introduction

Security protocol compliance for construction within operational facilities

ITP development and hold point management for critical systems

Critical infrastructure capabilities

Principal Designer

Design coordination for critical facilities

Quality Assurance

ITP development and inspection regimes

M&E Coordination

Mechanical and electrical interface management

Commissioning Support

Pre-commissioning and IST readiness

Change Control

Design change governance and tracking

Security Protocols

Secure facility construction compliance

What you get

Commissioning Readiness Pack

Verification checklist before IST and live load

ITP with Hold Points

Inspection and test plan for Tier certification

Change Control Log

Design change tracking with commissioning impact

M&E Interface Matrix

Coordination tracker between civil and services

Security Compliance Record

Documentation for vetting and access control

QA Dashboard

Real-time quality status for critical systems

Common failure modes

Where critical programmes fail

Mission-critical projects don't fail from single defects. They fail because quality verification was sacrificed for speed—and the accumulated shortcuts surfaced at commissioning when remediation cost peaks.

1

Design changes introduced without assessing commissioning timeline impact

2

QA inspections compressed to recover programme, missing critical hold points

3

M&E coordination gaps discovered at commissioning, not construction

4

Security requirements treated as operational concern, not construction gate

Matthews Consultants data centre project

Built for Tier compliance

We support hyperscale operators, colocation providers, and enterprise clients delivering facilities where uptime is the only metric that matters. Our QA regimes are designed for Tier III and IV certification requirements.

100+

MW supported

Tier III/IV

Compliance

Zero

Commissioning delays

Discuss your critical project

Whether hyperscale, colocation, or utilities infrastructure—our team understands the quality imperatives of mission-critical delivery.

Get in Touch

We will aim to respond within 24hrs.

Client Portal

The Client Portal provides secure access to project documents, progress updates, and direct communication with your Matthews & Roberts team.

Request access: info@matthewsroberts.com

Portal access is provided to approved clients. Contact us if you need support.

Existing client?

Access your project portal to view documents and track progress.

New enquiry?

Tell us about your project and we'll respond within 24 hours.